Fixed boarding bridge What are the installation steps for the fixed lifting platform?

Data: 2019-09-01
time: 3

The boarding bridge is mainly divided into fixed boarding bridge and mobile boarding bridge. According to the place of use and requirements, the fixed boarding bridge is divided into hydraulic boarding bridge, airbag type boarding bridge and mechanical boarding. bridge.


The fixed boarding bridge is equipped with hydraulic equipment and integral products in a fixed position to realize cargo transportation, high frequency of use and heavy bearing pressure。 It is widely used in factories, warehouses, platforms, terminals or ports for quick loading and unloading of goods, and can be directly loaded by forklifts。 Loading and unloading。 Let's take a look at the installation steps of the fixed docking bridge:


1. Digging pits (ground troughs): Digging pits are used to fix the boarding bridge (lifting platform) and give the boarding bridge (lifting platform) a place to be placed. The length, width and height of the pit are determined by the length, width and height of the boarding bridge or the non-standard boarding bridge products are customized according to the actual pit size.


2。 Fixing and welding: The installer welds the four corners of the bottom of the boarding bridge (lifting platform) and the embedded parts to ensure that the boarding bridge (lifting platform) is placed smoothly and firmly, avoiding slippage during the operation of the boarding bridge。 phenomenon。


3. Measurement level: After the boarding bridge (lifting platform) is fixed, check whether the level of the table top and the ground is on the same line or the table top is slightly lower than the highest position of the pit. This can speed up the loading and unloading of goods and improve efficiency.


4. Welding track: The welding track is to ensure that the fixed boarding bridge (lifting platform) does not shift during the ascent process, ensuring that the lifting platform rises smoothly.


5. Device power supply: When setting the pit, reserve the hole position of the line to connect the wires on the power box with the power cable and ensure the normal operation of the line.


6. Test machine: After the boarding bridge (lifting platform) is completed, it needs to be repeatedly tested several times to ensure that the boarding bridge (lifting platform) can be installed normally after installation.


The above is the sharing of the installation steps of the fixed lifting platform brought by Sanneng Xiaobian, I hope to help everyone!


Fixed boarding bridge What are the installation steps for the fixed lifting platform?



Correlation
Sanneng Company has a strong professional hydraulic platform mechanical equipment research and development team. The Sanneng brand has become a household name in the Pearl River Delta. Our company spe...
2020 - 07 - 02
product description:The loading and unloading platform is also called the boarding bridge or height adjustment plate, which is a loading and unloading operation platform for enterprises to quickly and...
2020 - 06 - 24
When answering a customer call, you will encounter the same problem, that is, how much pit should be reserved for the installation of a fixed hydraulic boarding bridge? In the storage and unloading, t...
2020 - 06 - 19
Mobile hydraulic boarding bridges are widely used in cargo platforms without loading and unloading equipment and mobile loading and unloading places, and are special auxiliary equipment for cargo hand...
2020 - 06 - 07
Recently, Shenzhen Sanneng Electromechanical Equipment Co。, Ltd。 was awarded the honorary title of 'AAA Credit Unit' by 315 National Credit System Credit Enterprise Certification and Changfeng Interna。。。
2020 - 05 - 18
400-0268-999
(24-hour national service hotline)
Copyright ©2002 - 2018 Shenzhen sanpower electromechanical equipment co. LTD.
犀牛云提供云计算服务
Follow Us:
X
1

QQ设置

3

SKYPE 设置

4

阿里旺旺设置

5

电话号码管理

  • 4000-268-999
6

二维码管理

unfold
聚沙彩票平台 向日葵彩票平台 趣发彩票平台 恒图彩票平台 人人盈彩票平台 我赢彩票平台 易权彩票平台 人人盈彩票平台 三号彩票平台 极云彩票平台